Our latest project can be found at the Chemical Plant in Beaumont – Texas. The 1st installation of its kind in the USA.
With an increased demand for flexible and versatile solutions for tanker loading and offloading operations, the possibilities with our intelligent QuayReel®/DockReel® System are becoming more apparent. In 2020 a QuayReel®/DockReel® campaign was launched, attracting a global following and sparking interest from a multi-national company. This client is a major US oil refining and petrochemical company with plants across the globe.
Over a two year period, after our initial contact, we have been working with their marine team at the engineering centre to establish a functional and engineering specification for the QuayReel®/DockReel®, as an alternative solution to their current operational requirements. In December 2022 the contract was awarded, the reels were shipped in August 2023 and installed in November 2023.
We have designed, built, delivered and installed 12 QuayReel®/DockReel® Systems, divided over 3 berths, as a replacement for their current 26-year-old marine loading arms.
Read more about the story here – https://techflowmarine.com/recent-projects/